TITLE & CONSTRUCTION UPDATES

STAGECONSTRUCTION PHASEFORECAST TITLES
Stage 4C:Titled
Stage 5C:Phase 3: Sewer & DrainageDec 2019
Stage 5D:Phase 1: Plan & PermitsJul 2020

We will continue to keep you updated on construction progress on site. We note that delays can be caused by circumstances beyond our control, such as weather, but we will do all we can to minimise their impact.

Phases of Construction Breakdown

Congratulations on the purchase of your future home site.

You’ve done the hard work in selecting where to live, now it’s over to us to get the land ready to build on.

1. Plans & Permits

Council and Authority acceptance of documentation including engineering design to allow physical works to commence on site.

2. Earthworks

Preparation of the site to achieve design lot levels including site scrape, shaping of the existing ground and construction of retaining walls if required.

3. Sewer & Drainage

Installation of sewer and drainage to service the development of the stage.

4. Road boxing, Kerb & Channel

Prepare the ground and start to construct the lower layers of the road pavement. Install water and gas mains and construct kerb and channel.

5. Electrical & Telecommunications

Trench and install electrical and telecommunication services once kerb and channel works are complete.

6. Footpaths & Asphalt

Prepare the ground in readiness to construct footpaths. Construct footpaths and topsoil nature strips. Construction of middle pavement layers and placement of asphalt.

7. Completion & Inspection of Works

Council and Service Authority works inspections and sign off to constructed works including roads and services. Provision of nal documentation to Council to facilitate a Statement of Compliance for the development stage.

8. Titles Office & Settlement

Registration of individual lots from each stage occurs at the titles office, and your block is now ready for you to settle & start the construction of your new home. Congratulations!